Glossary: R: Difference between revisions
From ICAR Wiki
No edit summary |
No edit summary |
||
| Line 28: | Line 28: | ||
:[[Glossary: Roughage_intake_control_system | Roughage intake control system]] | :[[Glossary: Roughage_intake_control_system | Roughage intake control system]] | ||
:[[Glossary: Routine_check | Routine check]] | :[[Glossary: Routine_check | Routine check]] | ||
:[[Glossary: Rumination|Rumination]] | |||
:[[Glossary: Rumination bout|Rumination bout]] | |||
:[[Glossary: Rumination-cycles-or-events|Rumination cycles or events]] | |||
:[[Glossary: Rumination time|Rumination time]] | |||
Latest revision as of 16:16, 11 March 2026
- Radio-frequency identification
- Re-certification
- Recorded cow
- Recorded herd
- Recording
- Recording interval
- Recording method A (ICAR)
- Recording method B (ICAR)
- Recording method C (ICAR)
- Recording period
- Records of characteristics of production systems
- Reference levels
- Reference Standard
- Registration
- Registration Authority
- Repeatability
- Reproductive lifetime
- Residual CH4 production
- Residual CH4 production rate
- Residual feed intake
- REST
- Restricted maximum likelihood
- RFID devices
- Root mean square prediction error
- Roughage intake control system
- Routine check
- Rumination
- Rumination bout
- Rumination cycles or events
- Rumination time
